Wates Living Space 1000th Ra Build: Royal Berkshire Court
28 new affordable homes consisting of both separate semi-detached houses and one, three-storey block of flats. There will be two one-bed flats, four two-bed flats, 13 two-bed houses and nine three-bed houses, one of which will be made suitable for a wheelchair bound resident. The site is completed with 51 parking spaces and makes use of micro-renewable technology in the shape of solar roof tiles.
Developer: Wates Living Space, Wates House, Station Approach, Leatherhead Surrey KT22 7SW
Client: A2Dominion, 15th Floor Capital House, 25 Chapel Street, London NW1 5WX
Project: The site was previously that of a sheltered housing block in a state of disrepair. Once demolished, A2Dominion worked in partnership with contractor Wates Living Space and South Oxfordshire District Council on the HCA-funded scheme to provide general needs housing. The development will offer much needed affordable housing in a mix of flats and terraced houses.
Build method: Ra Build: Thin jointed masonry shell with cavity wall construction as a labour-inclusive package
Value: £3.5 million. The aircrete value of the entire development is £439,000
Location: Royal Berkshire Court, Green Close, Didcot, Oxfordshire OX11 8TF
Type of contract: Design & Build
Architect: Calfordseaden, St John’s House, 1a Knoll Rise, Orpington,Kent BR6 0JX
Block-laying subcontractor: Minett Group, Units 1 & 2 Raymond Close, Wollaston, Northants NN29 7RG.
Minett Group is an established H+H UK recommended contractor
Build time: With the scheme split between individual houses and an apartment block, build time varied. Approximately 10 weeks were taken to complete the aircrete element of the apartment block. 16 weeks were taken to complete the houses. In total, some 5,200m2 of aircrete was laid.
Executive summary: The development made use of the Rå Build method of construction throughout. This involves building the entire inner skin of a building including inner leaf, internal and separating walls using H+H aircrete. The development had to meet level 3 of the Code for Sustainable Homes, as well as satisfying Parts L and E of the Building Regulations.
Product used / aircrete specification:
For the 22 houses:
3.6N/mm2
Jumbo Bloks 610 x 270 x 100mm thick
For the apartments:
7.3 N/mm2
Jumbo Bloks 610 x 270 x 147mm thick
Walls
The twin-skin internal and external walls use the same 100mm-thickness of H+H’s 3.6N/mm2 Jumbo Bloks. Rockwool insulation fills the 100mm cavities. For the apartment block’s outer walls, the higher 7.3N/mm2 specification Jumbo Bloks were applied to take the load of the extra storey. The interiors were lined with plasterboard on dabs.
”We also considered timber frame, but because Rå Build is more robust and has short lead times, cost savings can be made on the development.”
Ray Gasson, construction manager Wates Living Space
Floor: Concrete floor planks
The Rå Build method enabled Wates Living Space to cost the project with a saving of £20,000 less than using a timber-frame approach.
Rå Build created the exterior walls, upper floors and partitions as a labour-inclusive package supplied by the Minett Group, without any of the logistical problems associated with co-ordinating different trades for each stage.
The first-fix trades could start work inside whilst the external skin went up - therefore saving valuable time and money.
Unlike most frame systems, the Rå Build method required no waiting time for settlement before the mostly face-brick finishes and either render or Eternit composite weatherboard were applied.
The use of large-format lightweight aircrete and quick-setting thin-layer Celfix mortar enabled full-storey heights to be built in a day.
H+H aircrete applications:
- Internal and external leaf in cavity walls
- Solid walls
- Separating / party walls
- Flanking walls
- Partitions
- Multi-storey
- Foundations
The system enables the structure of a building to be constructed faster and to a better quality, allowing follow-on trades to start work sooner in a weatherproof environment, whilst retaining the flexibility of on-site construction. It is fully adopted as the preferred method of wall construction throughout most of northern Europe.
Aircrete is an excellent all round commercial and industrial building material. Used in partition and external walls (both solid and cavity), fire walls and as infill to steel and concrete framed buildings it provides durability, fire resistance and superb thermal and acoustic insulation.
The speed of build and waste reduction that can be achieved using the Rå Build method with the Celcon Thin Joint System helps in meeting the stringent requirements of build schedules.
Added to this H+H aircrete has exceptional sustainability credentials: not only does it provide excellent thermal and acoustic insulation and contributes to air-tightness but, being manufactured from 80% recycled materials, it is sustainable both in manufacture and in use. Couple this with H+H’s rigorous approach to pursuing the highest environmental standards throughout the whole of its business and it’s easy to see why this innovative and award winning system is now firmly established within the UK.
Contact details
For enquiries
Tel: 01732 886444
email: info@hhcelcon.co.uk
Head office
H+H UK Limited Celcon House Ightham, Sevenoaks Kent TN15 9HZ
Further reading
- H+H Thin Joint brochure
- H+H Jumbo Blok Brochure
- H+H Multi Plate Brochure
- H+H Rå Build Brochure
- Building a sustainable future
- The Excellence of Aircrete - the all round commercial and industrial building product Fact sheet 9 Solid wall construction Building with aircrete
For further information about the subjects covered or the H+H products used in this case study, please visit our website www.hhcelcon.co.uk